Main Gear

With the Quick Build Fuselage kit the main gear has been partially installed. However, there is still a large amount of work to do. To keep page size down, I broke chapter nine up using the manual's system, 9.1, 9.2, 9.3, etc.

9.1 Gear Legs
9.3 Bushings
9.2 Transverse Bulkhead -- Not a typo. I built in the wrong order!
9.4 Retract pulley/cylinder
        9.4.1 Pulley Assembly
        9.4.2 Gear Leg Sockets
        9.4.3 Hydraulic Cylinder
        9.4.4 MG Retract Cables
9.5 More Gear Legs!
9.6 Hydraulic System

Last  Main  Next